
Pedestrian and Bicycle Traffic Diverted Along Riverway near Back Bay Yards
As the US Army Corps of Engineers and its contractor, Charter Engineering, prepare to dredge the twelfth and final work area of the Muddy River
Home | Archives for MMOC

As the US Army Corps of Engineers and its contractor, Charter Engineering, prepare to dredge the twelfth and final work area of the Muddy River

The return of consistently warm weather marks the beginning of the Muddy River Restoration Project’s planting season. Landscaping plans vary by work area, but in

Although rarely observed in the Muddy River in recent years, blueback herring once migrated from the Charles River up to Leverett Pond to breed. According

Download PDF General: The Muddy River Flood Damage Reduction Phase 2 Construction Project is located in the footprint generally between Leverett Pond to Boylston Street