Home | Archives for MMOC | Page 23

Heavy equipment will be moved from the Intake area of the Muddy River across the Riverway thru the island across the Riverway Connector and into the old Sears Parking lot – Two lane shut downs on Riverway Connector, Riverway, Park Drive
View photos from the May/June 2013 Brookline Ave culvert excavation and excavation in the Sears Rotary and in front of Landmark, the new banners up at the Jug Handle and statnamic testing photos.
The construction areas have been enclosed with fence and barrier to prevent access to active work areas by the public.
Project banners showing schematic representations of the existing condition and phase 1 work are being installed along the construction fence near the Louis Pasteur sidewalk, the Jug Handle sidewalk, the Brookline Ave sidewalk and the Riverway sidewalk.