What are those big black nets in the Muddy River along the upper Fens? By Matt Eddy, MMOC Administrator Those “geo-cells” were installed as an experiment by the US Army Corps of Engineers during Phase 1 of the Restoration Read More » March 14, 2023
Project Update: The Flow Restriction Control Structure in Coming Down By Matt Eddy, MMOC Administrator The US Army Corps of Engineers and Charter Engineering have begun dismantling the flow restriction control structure (FRCS), the temporary Read More » March 14, 2023