Home | Archives for MMOC | Page 21
About a month ago (9/28) work was done to make Brookline Avenue a one-way inbound between the Riverway Connector and Park Drive. View photos that show the drilled shaft work, the wing wall slabs and Brookline Avenue during the bid traffic change.
The Muddy River Flood Risk Management & Environmental Restoration Phase 1 Construction Project is located in the footprint generally between the Riverway downstream to Avenue Louis Pasteur.
The Red Sox Playoff Game, on Friday, October 4, 2013, at 3:00 PM will begin to affect traffic on the streets surrounding Fenway Park as fans arrive around 2:00 PM. The traffic leaving the game combines with the PM rush hour often causing traffic delays in the LMA. Please plan accordingly.

“Mr. Speaker, I rise to celebrate the life and honor the achievements of Genie Beal whom I was honored to represent in the House. Genie Beal lived 92 years with grace and purpose. Her Memorial Service will be held, fittingly, in the Arnold Arboretum on September 26th. “
Vehicles traveling south on Park Drive, from Beacon Street, will not be able to use the right lane that leads directly onto Riverway. Traffic will need to stay straight to the lights and take a right hand turn to access Riverway.
Move a drill rig out of the old Sears Parking lot onto Brookline Ave. Travel on Brookline Ave. in opposite direction to Park Drive. Travel North on Park Drive 200 feet and turn back into the old Sears parking Lot.
The Muddy River Flood Risk Management & Environmental Restoration Phase 1 Construction Project is located in the footprint generally between the Riverway downstream to Avenue Louis Pasteur.

Move a drill rig out of the old Sears Parking lot onto Park Drive. Travel on Park Drive in opposite direction to Brookline Ave. Travel outbound on Brookline Ave 200 feet and turn back into the old Sears parking Lot.