Traffic Advisory: 10-30-14 & 10-31-14 9:30 am to 3:30 pm
Work inside drainage manhole on Brookline Ave inbound
Home | Archives for MMOC | Page 18
Work inside drainage manhole on Brookline Ave inbound

The Muddy River Flood Risk Management & Environmental Restoration Phase 1 Construction Project is located in the footprint generally between the Riverway downstream to Avenue Louis Pasteur.

Construction along the Muddy River reconfigured traffic over the weekend in the Fenway area, the Boston Globe reports, closing a strip along the Riverway — possible preparation should the region face another severe storm.

Traffic management plan during the third phase of Brookline Avenue culvert installation and initial phase of Riverway culvert installation for the Muddy River Flood Risk Management and Environmental Restoration Project, Boston, Mass.
Excavate Junction Box Pit from right lane of Brookline Ave. Single right lane closure on Brookline Ave. between Fenway and Park Drive

The Muddy River Flood Risk Management & Environmental Restoration Phase 1 Construction Project is located in the footprint generally between the Riverway downstream to Avenue Louis Pasteur.
Move a drill rig out of the Jug Handle laydown area onto Park Drive. Drill rig will walk up Park Drive against traffic and travel to the Upper Fens Pond laydown area.
Single right lane closure on Brookline Ave. between Fenway and Park Drive