LMA Traffic Advisory: Monday 12/01/14 thru Friday 12/05/14 — 9:30 am – 3:30 pm
Paving on Brookline Ave Inbound between Park Drive and Fenway
Home | Archives for MMOC | Page 18
Paving on Brookline Ave Inbound between Park Drive and Fenway
Paving on Brookline Ave Inbound between Park Drive and Fenway
Work inside drainage manholes on Brookline Ave inbound between Park Drive and Fenway
Work inside drainage manholes on Brookline Ave inbound between Park Drive and Fenway
Work inside drainage manhole on Brookline Ave inbound

The Muddy River Flood Risk Management & Environmental Restoration Phase 1 Construction Project is located in the footprint generally between the Riverway downstream to Avenue Louis Pasteur.

Construction along the Muddy River reconfigured traffic over the weekend in the Fenway area, the Boston Globe reports, closing a strip along the Riverway — possible preparation should the region face another severe storm.

Traffic management plan during the third phase of Brookline Avenue culvert installation and initial phase of Riverway culvert installation for the Muddy River Flood Risk Management and Environmental Restoration Project, Boston, Mass.