Traffic Advisory: Monday 11/10/14 thru Friday 11/14/14
Work inside drainage manholes on Brookline Ave inbound between Park Drive and Fenway
Home | Archives for MMOC | Page 18
Work inside drainage manholes on Brookline Ave inbound between Park Drive and Fenway
Work inside drainage manholes on Brookline Ave inbound between Park Drive and Fenway
Work inside drainage manhole on Brookline Ave inbound

The Muddy River Flood Risk Management & Environmental Restoration Phase 1 Construction Project is located in the footprint generally between the Riverway downstream to Avenue Louis Pasteur.

Construction along the Muddy River reconfigured traffic over the weekend in the Fenway area, the Boston Globe reports, closing a strip along the Riverway — possible preparation should the region face another severe storm.

Traffic management plan during the third phase of Brookline Avenue culvert installation and initial phase of Riverway culvert installation for the Muddy River Flood Risk Management and Environmental Restoration Project, Boston, Mass.
Excavate Junction Box Pit from right lane of Brookline Ave. Single right lane closure on Brookline Ave. between Fenway and Park Drive

The Muddy River Flood Risk Management & Environmental Restoration Phase 1 Construction Project is located in the footprint generally between the Riverway downstream to Avenue Louis Pasteur.