Cruising Down the Muddy River on a Snowy Morning
Taking sediment samples. (January 30, 2015)
Home | Archives for MMOC | Page 17

Taking sediment samples. (January 30, 2015)
Excavator will be moved from the Old Sears Parking Lot onto Park Drive and continue to the Riverway work zone.

The Muddy River Flood Risk Management & Environmental Restoration Phase 1 Construction Project is located in the footprint generally between the Riverway downstream to Avenue Louis Pasteur.

The Muddy River Flood Risk Management & Environmental Restoration Phase 1 Construction Project is located in the footprint generally between the Riverway downstream to Avenue Louis Pasteur.
The rightmost lane on Park Drive headed inbound before Riverway Connector will be temporary closed to allow the unloading of a truck.
Paving on Brookline Ave Inbound between Park Drive and Fenway

Traffic flow will remain in the same traffic pattern from the last traffic changes in March and September 2014.
Paving on Brookline Ave Inbound between Park Drive and Fenway
Paving on Brookline Ave Inbound between Park Drive and Fenway