Muddy River Phase 1 Construction Update from US Army Corps of Engineers, Michael F. Keegan, Project Manager, November 27, 2013
All of the drilled shafts in stage 1A2 have been installed and both pile caps have been poured. The installation of the invert slabs was started and the slabs should be in place by the end of the first week of December.